Harga Bahan Bangunan Di Monokowari, Sorong, Papua Sekitarnya

harga material bangunan di papua
Harga Material di Wilayah Papua
Kumpulan Daftar Harga Bahan Bangunan baik Barang dan Jasa serta Alat Di Monokowari, Sorong, Papua Sekitarnya

Daerah         : 
1. Monokowari
2. Sorong
3. Papua Sekitarnya
Tahun           : 2020






NO.
UNIT PRICE MATERIAL, REMUNERATION AND RENT OF EQUIPMENT
UNIT
 PRICE

 (Rp.)

I

MATERIAL :









1

Portland Cemen (PC)
kg
           1.918,35

2

Colour Cement
kg
           2.968,88

3

Red brick
unit
           1.644,30

4

Crushed Stone
m3
        319.725,00

5

Split 1/2
m3
        383.670,00

6

Split 2/3
m3
        365.400,00

7

Gravel
m3
        383.670,00

8

Sirtu
m3
         82.215,00

9

Dust split
m3
        365.400,00

10

Sand
m3
        205.537,50

11

Soil
m3
         27.405,00

12

BBM / solar
litre
           7.947,45

13

Water
litre
                91,35

14

Plain reinforced steel U 24 - BJTP 24
kg
           9.518,67

15

Galvanis steel angle HTS
kg
         13.245,75

16

Galvanis steel angle MS
kg
         11.875,50

17

Sceew reinforced steel U 32 - BJTD 40
kg
         15.529,50

18

Galvanis Bolt and Nuts
kg
         47.958,75

19

Profil IWF
kg
         15.529,50

20

Plat Bordes 6 mm
kg
         15.529,50

21

Band plate
kg
         15.529,50

22

Steel L50x50x5
kg
         15.529,50

23

Strip plat 20.3
kg
         25.578,00

24

Paint of steel
kg
         73.080,00

25

Paint of wooden
kg
         50.242,50

26

Paint of wall Emulsi
kg
         24.000,00

27

Paint of wall Weathershield
kg
         22.837,50

28

Thinner
Liter
         31.972,50

29

Kuas / Rol
no
         21.010,50

30

Plamur of wall
kg
         68.512,50

31

Polished of steel (Sand Paper)
sheet
         22.837,50

32

Polished of wooden (Sand Paper)
sheet
         22.837,50

33

Door closer
no
         59.377,50

34

Hinge for door (1 set= 3 pcs)
set
         63.945,00

35

Hinge for window (1 set= 2 pcs)
set
         36.540,00

36

Door lock
no
        127.890,00

37

Door Holder (1 set= 2 pcs)
no
        173.565,00

38

Grendel for window (1 set= 2 pcs)
no
         18.270,00

39

Grendel for door double swing
no
         27.405,00

40

Wind hook of window (1 set = 2 pcs)
set
           6.394,50

41

Palm fibre
kg
         16.443,00

42

Concrete wire
kg
         12.789,00

43

Galvanis of wire mesh dia 4 mm
kg
         18.270,00

44

Barbed wire
barbed wire
barbed wire
kg
         55.000,00

45

Wooden
m3
     2.740.500,00

46

plain meranti 2/20 cm
sheet
         47.958,75

47

Meranti beam  6/12 cm
frame
         62.639,61

48

Meranti beam  5/7 cm
frame
         30.449,70

49

Dolken dia. 10 cm, length 4 m.
stick
         41.107,50

50

Granite wall tiles 400 x 400 mm
m2
        120.000,00

51

Granite floor tiles 600 x 600 mm
m2
        180.000,00

52

Granite floor tiles 300 x 300 mm
m2
         54.000,00

53

Granite floor tiles 300 x 600 mm
m2
        108.000,00

54

Glazed ceramic floor tiles 400 x 400 mm
m2
         77.647,50

55

Glazed plint tiles 100 x 400 mm 
no
         41.107,50

56

Granite plint tiles 100 x 600 mm 
no
         41.107,50

57

Stepnosing 100 x 400 mm
no
         18.270,00

58

Naturally paint (Meni)
kg
         31.972,50

59

Minyak bekisting
litre
           3.014,55

60

Fence BRC height 1,50 m lenght 2,40 m
set
        548.100,00

61

Fence BRC height 1,90 m lenght 2,40 m
set
        591.948,00

62

Nail
kg
         16.443,00

63

Nail drat
no
         18.270,00

64

Double Gate BRC height 1,90 m lenght 3,30 m complete
unit
     1.370.250,00

65

Single Gate BRC height 1,90 m lenght 1,10 m complete
unit
        456.750,00

66

Pipe of steel  Dia 2 inc lenght 6,00 m
stick
        182.700,00

67

Pipe of steel  Dia 3 inc lenght 6,00 m
stick
        228.375,00

68

Pipa Concrete dia 30 cm
m'
        109.620,00

69

PVC Pipe dia 2 "
m'
         27.405,00

70

PVC Pipe dia 4 "
m'
         41.107,50

71

PVC Pipe dia 6 "
m'
         50.242,50

72

Zinc 
sheet
         63.945,00

73

Zinc  Roof BJLS 30
Sheet
         49.329,00

74

Roofing Klip-lock Hi-Ten t=0.50 mm
m2
         50.242,50

75

Roofing Spandek Colorbond
m2
         69.426,00

76

Nok Standard Hi-Ten 
m'
         22.837,50

77

Nok Spandek Colorbond
m'
         27.405,00

78

T/L 1 x 36  Watt (incld armateur)
no
        100.485,00

79

T/L 2 x 36  Watt (incld armateur)
no
        100.485,00

80

T/L CDL E27 (1 x 8 W)
no
         86.782,50

81

T/L CDL E27 (1 x 23 W)
no
        137.025,00

82

Clear lamp celling 60 watt
no
        146.160,00

83

Downlight
no
         50.242,50

84

Glass 5 mm
m2
         59.377,50

85

Playwood 12 mm
sheet
        109.620,00

86

Triplex 4 mm
sheet
         86.782,50

87

Gypsum board 9 mm
sheet
         86.782,50

88

Listplank Superplank (GRC board)
sheet
         50.242,50

89

Baja Hollow 40.40.08
m'
         24.664,50

90

Baja Hollow 40.20.08
m'
         17.356,50

91

List profil gypsum
m'
         31.972,50

92

Tepung gypsum
kg
         20.097,00

93

Glasswool t=10 cm, aluminium foil (single sided) with 2 (two) layer
m2
         27.405,00

94

Roof mesh
kg
         31.972,50

95

Close-coupled with eco washer complete
no
        314.430,00

96

Squatting water closed complete
no
        411.075,00

97

Ceramic bowl urinal complete
no
        274.050,00

100

Chromium plate toiled roll holder
no
        274.050,00

101

Chromium plate soap dish
no
        137.025,00

102

Chromium plated hat and coat hook
no
        137.025,00

103

Tangki Air Stainless Steel Kap : 1000 lt
no
     5.000.000,00

104

Kansteen (10 x 20 x 60) cm
no
         35.078,40

105

Kansteen (25 x 30 x 50) cm
no
        129.717,00

106

Landscaping
m2
         45.675,00

108

Stop contact incl installation wiring
no
         22.837,50

109

Exhaus fan wall 60 W/220 Volt (16") industrial
no
        867.825,00

110

Exhaus fan ceiling 40 W/220 Volt (10") very low noice
no
        593.775,00

111

Emergency lighting lamp 40 W complite
no
        228.370,00

112

Anchor Bolt Dia. 16 mm (1 Sets), HDG
Set
        182.700,00

113

Anchor Bolt Dia. 22 mm (1 Sets), HDG
Set
        228.375,00

114

Anchor Bolt Dia. 24 mm (1 Sets), HDG
Set
        274.050,00

115

Waterproofing
kg
         45.675,00

116

Serat Fiber
m2
         30.000,00

117

Floorhardener ex sika
kg
         31.972,50

132

Additive for  concrete corrosion prevention/waterproof
Liter
         45.675,00

133

Grating / Grill
kg
         14.616,00

134

Pupuk Kandang (1 karung = 7 kg)
karung
         31.972,50

135

Pohon Mangga (tinggi bibit 50 - 70 )
unit
         45.675,00

136

Rumput Gajah Mini
m2
         32.000,00

137

Tanaman Teh-tehan (tinggi 25 - 35 cm)
unit
           4.500,00

138

Kusen Aluminium
m'
        109.620,00

139

Daun pintu Aluminium
m2
     1.370.250,00

140

Door Glass 5mm
m2
     1.370.250,00

141

Wash basin complete (Wastafel) Stainless
no
        450.000,00

142

Water Tank Stainless Cap 2 m3 setara Penguin Plastic
unit
        456.750,00

145

AC split 2PK 
unit
     5.481.000,00

146

AC split 1 PK 
unit
     3.197.250,00

147

Jet pump capacity 32 liter/menit H=30 m
unit
     4.567.500,00

148

Panel Box MCB complete with R.S.T lamp indicator and contactor grounding Panel Box  80x120x25 cm 
unit
   13.702.500,00

149

Capacity Electrical
Ls
     2.000.000,00

150

Kabel NYM 3x2,5MM @100M
1 roll
        913.500,00

151

T Doos
buah
           4.567,50

152

Isolator
buah
        550.000,00

153

Clamp steel plate
buah
           8.000,00

154

Fitting Plafond
unit
         50.242,50

154

Jarum penangkal petir
pcs
         74.050,00

155

Kabel / kawat BC 25 mm
m'
         45.675,00

156

Cooper Rod
m'
        240.000,00

157

Key Box
unit
        274.050,00

158

Gate Valve 4 in
unit
        913.500,00

160

Flagpole Stainless Steel ø 3" with acc
unit
     4.567.500,00

161

Name plate GI 150 kV
unit
     4.567.500,00

162

Alarm bell 6'' ( 150 mm ) diameter to approval surface mounted in Lobby
unit
        400.000,00

163

Smoke detector 
unit
        350.000,00

164

Fixed and rate of rice temperature detector
unit
        228.375,00

165

MCFA ( Master control fire alarm ) kap 15 zone included indication lamp, battery rectifier and all accessories
unit
   13.702.500,00

166

Portable fire extinghuister type dry chemical ( 5 kg hallon )
unit
     2.627.000,00

167

Mobile unit powder fire extinghuister ( 50 kg hallon )
unit
     6.394.500,00

168

Portable type 6 kg CO2 c/w wall bracket
unit
        228.375,00

169

Hydrant box and accessories
unit
     9.135.000,00

170

Talang Zincalume
buah
         91.350,00

171

Paving block
buah
           4.567,50



















II

REMUNERATION









1

Worker
man/day
         80.000,00

2

Surveyor
man/day
        110.000,00

3

Supervisor
man/day
        110.000,00

4

Operator
man/day
        100.000,00

5

Brick Layer
man/day
        100.000,00

6

Steel worker
man/day
         80.000,00

7

Carpenter
man/day
        100.000,00

8

Paint worker
man/day
        100.000,00

9

Mechanic
man/day
        100.000,00

10

Asphalt worker
man/day
        100.000,00

11

Worker Chief
man/day
        115.000,00







III

RENT OF EQUIPMENT









1

Molen of machine 0.35 m3
unit/day
        250.000,00

2

Buldozer
unit/day
     3.200.000,00

3

Truk 3 - 4 ton
unit/day
        800.000,00

4

Mobilisasion Equipment
ls
 100.000.000,00

5

Support equipment ( key + safety belt )
hour
         50.000,00

6

Stamper /Stomwalls
hour
         30.000,00

7

Theodolit
hour
         87.500,00

8

Small crane
unit/day
     4.000.000,00

9

Pile connection
no
        250.000,00

10

Vibrator
hour
        312.500,00

11

Jack Hammer
unit/day
     1.000.000,00

12

Gergaji
bh
        100.000,00

13

Hammer
bh
        150.000,00

14

Tripod
unit/day
        200.000,00

15

Roller Vibro
hour
     3.200.000,00

16

Water Tank Truck
unit/day
        800.000,00

17

Excavator
unit/day
     3.000.000,00

18

Jet
unit
     3.000.000,00

19

Pipa 1 1/2
m'
     3.000.000,00

20

Pipa 1
m'
     3.000.000,00

21

Deepwell including submersible water pump 150 lt/m capacity and accessories
unit
   15

Daftar harga ini didapatkan dari rekan-rekan teknik / pelaksana lapangan yang berada di tersebut.

Daftar harga diatas dapat berubah sewaktu-waktu berdasarkan fluktuasi ekonomi yang berlaku. Keterangan harga ini dibuat untuk membantu dan mempermudah bagi masyarakat, para owner dan kontraktor untuk menganalisa harga di daerah tersebut.

Download Harga Material Bangunan Di Monokowari, Sorong, Papua Sekitarnya